Dear EDGE User,

We have introduced a new point version system each time there are slight modifications to the EDGE software. You will notice that the current version is 2.0.1, which appears in the upper left-hand corner of the EDGE interface:



With Version 2.0.1, the Project Stage can now be selected in the Project Details section at the top of the Design tab:



Selection of either Preliminary or Post-Construction impacts the uploading feature under each measure, in terms of the documentation required for taking a project forward to certification.

Additionally, Wall Insulation and Roof Insulation will only appear in the Materials section if ticked in the Energy section.

And finally, modifications have been made to calculations in the Homes tool for Vietnam and Indonesia. If you have residential projects saved for these countries, you may see small impacts to your results that better reflect reality. These modifications have been made based on user feedback from the respective countries that was carefully reviewed prior to implementation.

We hope this update has been helpful and thank you as always for your support of EDGE.

The EDGE Team